Resources

Control room construction checklist: what to define before pricing.

For owners, owner’s representatives, design teams and integrators planning a control room or operations center.

Highlands Construction · November 2026

Control rooms and operations centers are some of the most coordination-heavy spaces in commercial construction. Control-room projects bring architectural work, building systems and operational equipment together, sometimes across several rooms or buildings, and several parties design and furnish different parts of them. Before requesting pricing, clarify the items below and record unresolved decisions, pricing assumptions, allowances and exclusions.

Apply this checklist to the facility being planned. Console and video-wall items apply to operator environments; utility control houses and industrial control rooms may require additional equipment, environmental and owner-specific design criteria.

01Define the room and how it will operate

Pricing starts with what the room is for. An operations center that runs around the clock has different power, cooling and access needs than a room staffed during business hours. A utility control house is a different building again. For utility control houses, confirm station AC/DC supplies, protection and communications panels, battery and charger provisions, cable entries and grounding interfaces, and ask the responsible designers to identify applicable ventilation, environmental and safety requirements. For process facilities, establish any special hazard or building-protection criteria.

02Assign design and furnish responsibilities

Scope gaps can leave equipment, connections or testing responsibilities unassigned. Record who designs, furnishes, installs, connects, tests and accepts each package.

03Lock down console and video-wall requirements

Consoles and video walls drive the room’s layout, structure, power and cabling. The integrator’s approved requirements need to reach the design team before the walls and ceilings are priced.

04Confirm power requirements

Power design belongs to the engineer of record, but the contractor needs the requirements settled to price the work accurately.

05Confirm cooling and heat loads

Verify equipment heat output, operating hours and environmental requirements with the suppliers and mechanical designer. Do not assume the existing HVAC capacity or operating schedule is adequate.

06Plan low-voltage pathways and security

Confirm pathway routes, capacity, separation requirements and penetration details before pricing.

07Specify lighting and acoustics

Operators look at screens for long shifts. Glare and noise are design decisions, so the specified requirements need to be in the documents rather than left to the field.

08Plan phasing for occupied or existing buildings

When the room is built inside an operating facility, the construction plan has to protect what is already running.

09Agree on testing and turnover

The room is not finished when construction is. Settle readiness milestones and the documents the owner needs at handover.

To assign who designs, furnishes and installs each item, see the control room scope matrix.

For construction scope and delivery discussions, see our control room and operations center construction services.

Planning a control room?

Tell us whether it’s a new building or an interior build-out, who is providing design and systems integration, and your target installation and turnover dates.